Phase I

Pre-Engineering:

This phase focuses on increasing end-to-end operational capacity from approximately 5GW to 7GW of power generation.

This will be done through the reinforcement of existing transmission and distribution assets. This begins with the pre-engineering phase, which was signed in February 2021.

There are several projects under this phase, on transmission, distribution, National Metering Systems (MDMS), Power Stimulations for Nigeria (PSS4N), and training.

The transmission and distribution projects will involve upgrading existing substations, and the installation of new substations and transformers. The other projects include the deployment of smart metering systems, preparation and network development studies for phases 1 & 2, and training on products installed.

Transmission initiatives at 16 sites. Support to the Regulator for pilot and transition program for improving metering.