Factory Acceptance Test for 60MVA, 132/33kV power transformer to be installed as part of the mobile substation units to be deployed in various parts of Nigeria under the Presidential Power Initiative (PPI) at Siemens Transformer Factory Dresden, (STDD), Germany.
Standing before the successfully tested transformer:
In the front row, from right to left: Mr. Ahsan Hasib (Siemens Energy – SE), Engr. Idowu Oyebanjo (Chief Technical Officer, FGN Power Company of Nigeria Limited), Ms. Bettina Dittrich (SE), Mr. Federic Achard (SE S.A.S).
In the back row, from right to left, Mr. Antoine Larger (SE S.A.S) & Mr. Udo Wagner (SE STDD).
The last picture features Engr. Idowu Oyebanjo, Chief Technical Officer FGN Power Company of Nigeria Limited, dutifully checking that documented results of Factory Acceptance Test are in line with actual specifications and guidelines provided by NERC, NEMSA, TCN and FGN Power Company (FGNPC).