Siemens Power Technologies International (Siemens PTI) offers a holistic approach to mastering the technical and economical challenges of today’s and future energy systems. Drawing upon more than 60 years of experience and continuous innovations in power system planning, Siemens PTI will develop innovative solutions which create sustainable value for the PPI.
The PTI Package for the PPI is split into 2 main workstreams, Power System Simulation (PSS) for Nigeria, and System Development Studies.
System Development Studies for Phases II and III of the Nigeria electrification Roadmap will be conducted to increase system peak operating capacity, improvement of supply reliability, derivation of necessary investment measures for short, medium, and long-term network development.
Ground Floor, Niger Delta Power Holding (NDPHC) Building
1490, Samuel Ademulegun Avenue
CBD, Abuja, Nigeria